Monthly Archives: August 2011

Losing Fluid

I have spent the greater part of the Bank Holiday (albeit very contentedly) in the workshop, so it seemed like a pleasant idea to round it off with a trip to the pub in the Jag.  On the way home … Continue reading

Posted in Our Cars | Tagged , | Leave a comment

A Case of the DTCs

Or to give them their full name, “Diagnostic Trouble Codes”. I have a Jaguar XK8 in the workshop at the moment which drives everywhere in “limp mode” and displays “Gearbox Fault” on the dashboard.  Plugging in the laptop reveals a … Continue reading

Posted in Still working on it...., Technical | Tagged , | Leave a comment

Stacking Dimes

I have a fair bit of sheet aluminium fabrication to look forward to soon, so with this in mind I have been taking a bit of time to practise some extra skills.  Usually my preferred choice for welding aluminium is … Continue reading

Posted in Technical | Tagged | Leave a comment

More Scimitars and Jaguar MOT

It has been far too long since I last blogged, which is rather indicative of how busy things have been in the workshop for the past week or so.  This is not least because I seem to have been dealing … Continue reading

Posted in General, Our Cars | Tagged , | Leave a comment

Deeply Scratched and Highly Polished

Today saw the last of the machining operations for the Scimitar – to – Type 9 gearbox conversion with the manufacture of an aluminium bracket which reproduces the original speedo cable fitting on the later gearbox. I learned my first … Continue reading

Posted in Still working on it.... | Tagged , | Leave a comment

Testing cars and signing for parcels

It will most likely not come as any surprise to regular readers that much of today has been taken up with things Scimitar and the car has now had a successful first road test. A temporary cable connection has made … Continue reading

Posted in General, Still working on it.... | Tagged , , | Leave a comment

Scimitar Continues

The new gearbox went into the Scimitar this evening after attending to a few odds and ends prior to fitting.  The new clutch proved to be slightly less than straightforward: This particular car has a 10.625 inch pitch circle for … Continue reading

Posted in Still working on it.... | Tagged , | Leave a comment

The Correct Settings

I had a visit from a Bristol 403 today (not forgetting its owner) for the fitting of new rear shock absorbers – or to use the more technically correct term: dampers.  One of the things we discussed was the intital … Continue reading

Posted in Job finished, Technical | Tagged | Leave a comment

Scimitar Taking Shape

The bellhousing conversion for the Ford Type 9 Gearbox in the Scimitar SE5A is now finished and pictured here as a trial assembly.     Also pictured is the new cover assembly for the selector rail which has to protrude … Continue reading

Posted in Still working on it...., Technical | Tagged , | Leave a comment